Civil, electrical, mechanical, fire-fighting and HVAC works for construction of submarine section assembly workshop with office building and it’s ancillary structure at Alcock yard
Salient Feature:
- SSA Workshop Size: 220 M (L) x 45 M (W) x 39 M (H)
- Motorized Remote Operated sliding Gate sized 40 M x 18 M
- Treated Fresh Air Fans (TFA)
- Forced Air Ventilation (FAV)
- Fume Extraction System
- Fire-Fighting System
- Compressed Air piping system
- Oxy-acetylene piping system
- Passenger lifts
- Roads and stormwater drain network
- Electrical Substation
- G+4 Storied Office Building
- + 3 Storied Rest Room
- Water Management System (STP, GWTP, Oil Water Separator, Rain Water Harvesting, etc.
Mazagon Dock Limited, Mumbai